Research snapshot: October 10, 2026. The latest linked construction schedule ends October 4. This guide explains the published record; it does not show live closures.

01 / The project & its benefits

Ready for higher tides.
Better for everyday life.

Flood resilience meets everyday comfort. These are the city’s planned benefits, dependent on the completed systems and final design.

$100.2m
Posted project budget

Overall improvements budget; not the amount spent.

≈24″
Road raising described

Varies by location; entrances and driveways must meet the new street.

8th →
Lincoln Road & beyond

West Avenue: 8 Street–Lincoln Road. Bay Road and Lincoln Court extend to Collins Canal.

Better prepared for high water.

Raised streets and sidewalks address tides and rising seas; new drainage, treatment and the P24 pump station aim to reduce rain flooding.

More reliable water and sewer.

New underground pipes replace aging lines to reduce breaks and service interruptions.

More shade. Room to move.

Renewed, wider sidewalks, buffered bike lanes, trees and upgraded lighting improve comfort and the streetscape.

Closer to the bay.

A planned Baywalk segment at 1450 Lincoln Road and street-end upgrades add waterfront connections and public space.

The timeline / From plans to pavement

How we
got here.

A few milestones from the city’s public record, followed by the work still ahead. Dates describe published updates; scheduled work is not confirmation that it happened.

  1. Property plans meet the public.

    A public harmonization meeting explains how raised streets would connect to existing buildings, entrances and driveways.

    City project archive · May 20 public meeting

  2. The street takes shape on paper.

    The city publishes its design-review presentation with streetscape renderings and property examples—the images shown below come from this stage.

    Design Review Board · April 5 presentation

  3. Attention turns to the pump station.

    The city’s January advisory reports that pump-station work is continuing at P24, north of the post office.

    City project archive · January 2024 advisory

  4. A major construction milestone.

    The project team reports the pump station and Collins Canal outfall substantially complete. This describes construction progress, rather than confirmation of operation.

    January 2026 progress presentation · Slide 3

  5. You are here

    Connections and approvals remain.

    As of this guide’s October 10 review, this is the latest published milestone. September 3’s update reports inspections complete for Segment 2 and approvals for the first five properties. The September 14 look-ahead still lists power, utility relocation and drainage approvals as dependencies.

    September 3 update + September 14–October 4 schedule

  6. Still ahead / Date to be confirmed

    Power. Connections. The finished street.

    The published dependencies include pump-station power and testing, property drainage approvals and utility relocation before road raising and harmonization. The latest schedule says the projected finish depends on drainage surveys; it does not give a confirmed overall completion date.

    Published record reviewed October 10, 2026 · City timeline sources ↗

02 / The part you can’t see

What happens
next.

The project team is coordinating power, property connections and utility relocations. These are the key dependencies described in the latest published schedule.

01

The station needs
power and testing.

January’s report called the pump station and canal outfall substantially complete. September’s schedule still listed pending FPL power work and testing affected by missing power. Construction progress does not establish that the system is operating.January report + September 14 schedule

02

Each property
connection matters.

By September 3, inspections were complete for Segment 2 and the first five properties had approvals. Road raising and harmonization were to be scheduled after all Segment 2 county permit modifications were obtained.September 3 meeting presentation

03

Utilities have
to move first.

The September 14 schedule marked Alton Court sewer, drainage and watermain completion delayed pending FPL relocation. County drainage approvals and utility relocation were identified as critical dependencies for road raising.September 14–October 4 look-ahead

03 / Around the corner

Different blocks.
Different impacts.

These are the conditions described in September’s documents. Verify today’s parking and access arrangements with official advisories.

LINCOLN ROAD16 STREETLINCOLN CTBAY ROADWEST AVENUEALTON CTCOLLINS CANALBISCAYNE BAY010203↑ N

Northern area only · Schematic, not to scale.
Markers identify places, not closure boundaries.

01 / 1671 WEST AVENUE

The pump station

The new station sits in P24, beside the post office. September’s schedule reported paving and grading complete, while electrical installation and power for testing remained pending.

The next milestone to ask about: commissioning

02 / LINCOLN ROAD & BAY ROAD

Connections and access

September’s update listed no parking on Lincoln Road from Alton Road to the western street end, and on Bay Road north of Lincoln Road. Lincoln Court pedestrian bridge access was restricted during workdays, with night and weekend openings described.

Reported September 3 · Current conditions unverified

03 / 16 STREET & ALTON COURT

Work beneath your feet

September’s presentation listed 16 Street closed between Bay Road and Alton Court, with no parking on that stretch. Water-quality wells and drainage work were underway, alongside unresolved utility conflicts on Alton Court.

Typical hours: 7 a.m.–5 p.m. weekdays; Saturdays as needed

04 / The details close to home

A glimpse of the
finished street.

The city has published streetscape renderings and property-specific examples. These images come from its April 2022 design-review presentation; they show proposals from that stage, rather than a confirmed final design for every property.

City-published proposed streetscape at 16 Street and West Avenue, facing north, showing sidewalks, planting, bicycle markings and paved crossings.
16 Street & West AvenueFacing north · Proposed streetscape · April 2022, slide 18
City-published harmonization rendering at 1237 Lincoln Road showing a planted streetscape, parking and a railing beside the property.
1237 Lincoln RoadProperty harmonization example · April 2022, slide 28

Images: City of Miami Beach, DRB21-0704 updated presentation, April 5, 2022. View the published presentation ↗

How the street
meets your building.

“Harmonization” connects the raised sidewalk and road to existing entrances and driveways. The city’s presentation illustrates several properties, and its May 2020 outreach materials describe a review package with a harmonization plan and customized rendering. Your building’s current package is the place to confirm its details.

The April 2022 FAQ says gates, fences or paving may need adjustments, with some costs falling to owners. Owners also retain responsibility for maintaining private drainage.

Parking is drawn
block by block.

The project website also publishes April 2023 signing and pavement-marking plans, showing parking, crossings and street layouts. Those drawings predate the December 2023 mitigation proposal, so they should not be treated as the final parking arrangement.

That later proposal described approximately 102 spaces lost with about 44 returned—roughly 58 fewer under that historical proposal, rather than a verified final count.

Published parking plans · April 2023 ↗

05 / Public outreach

Stay connected
to the project.

The city publishes these contacts and channels for project information, construction alerts and neighborhood advisories.

Public information liaison

Heather Leslie

305-905-5876
heather@hmlpublicoutreach.com

South Beach Neighborhood Affairs Manager

Lauren Firtel

LaurenFirtel@miamibeachfl.gov

Construction alerts

The official West Avenue WhatsApp channel shares construction alerts, traffic updates and project notifications.

West Avenue project channel ↗

Neighborhood advisories

Receive the city’s South Beach neighborhood and construction advisories by email.

City email-advisory subscription ↗

Contacts and channels published on the official project page; Heather’s phone number is also listed in the September 2026 meeting presentation.